Riseholme College, Stage 2

Our works included the supply, installation and commissioning of Industrial Gases Pipeline Systems and a Compressed Air system at Riseholme College. We supplied new sources of supply for, Oxygen Acetylene, Carbon Dioxide and Argon gases, all distribution systems were in degreased Copper with the exception of Acetylene which was 316 Stainless-Steel. Regulated Outlet points were supplied and installed as the final connections for all gases to welding bays.

We also supplied, installed and commissioned a new Compressed Air system which included a new Air Compressor complete with dryers, receivers and filters and an extruded aluminium distribution system, complete with quick release couplings at the termination of pipelines for easy connections.

All completed works were done in compliance with BCGA CP4 guidelines.

Related Projects